Global Distributor Recruitment | Create the Future of Battery Testing Together
NEWARE technologies learning center
Previous
Next
The actual voltage at both ends of the device when it is operating.
Take the Current as the Cut-off condition in the work steps.
When the power supply is abnormal, the system stores data in a timely manner to prevent data loss.
Take C-rate as the Cut-off condition for the work steps.
During the battery charging and discharging process, the electric energy released by the battery discharge is recovered and supplied to the adjacent channel or other nearby test instruments for use, thus achieving the purpose of energy saving.
The battery is charged/discharged at constant power.
September 26, 2022
The 5th Organic Battery Days at the University of Houston will take place on October 13–14, 2022.
May 07, 2024
June 04, 2023
The World Congress of Chemical Engineering (WCCE) is organized by the World Federation of Chemical Engineering (WCEC) every four years, alternating between Europe, America and Asia, and is a global co
May 15, 2024
About the ShowBattery Cells & Systems Expo will bring together automotive manufacturers, electric utilities, battery system integrators, cell manufacturers and the entire manufacturing supply chain.
March 13, 2024
2024 Partial Speakers2024 Partial Attendee List PreviewEXHIBIT AND POSTER SCHEDULE
August 05, 2024
With the wide application of batteries in our current mobile society, the safety issues of batteries have become one of the top concerns. Emerging in-situ/operando characterizations, advanced experimental approaches, and modeling methodologies have been proposed to enhance understanding of the fundamental science of battery safety behaviors and provide powerful design tools for the next-generation safe battery.