Today's demonstration is to add or remove the "Set parallel, Free parallel" function key in the right-click menu.
First, open the BTS8.0 software.
Click "Set", click "System settings", select "Display settings".
Scroll down and find "Right-click menu function".
Find "Set parallel, Free parallel" and check or cancel it.
Finally, click "Save".
That is all about this topic.Thanks for watching!
This operation video tutorial is applicable to the following products: ● CT-4000 Battery Testing System Series (CT-4008Q-5V100mA, CT-4008Q-5V6A-S1, CT-4008Q-5V6A-164, CT-4008Q-5V12A-S1, CT-4008Q-5V12A-164, etc.)● CE-6000 Battery Testing System Series (Cell, Module, Pack, etc.)● CT/CTE-8000 Battery Testing System Series (CT-8002Q-5V100mA, CTE-8008-5V200A, etc.)● All-in-One Battery Testing System Series (WHW-25-S-16CH, WIHW-200-160CH-B, WHW-100-2-160CH, WHW-500-5V6A80CH-380V, WGDW-380-2-40BFC-5V600A8CH, etc.)
Previous
Next
Add user groups and their permissions Today we will demonstate how to add user groups and their permissions.
Turn on the pre-set cycle test work step file.First set aside for 3 hour to allow the battery to stabilize internally.Since the study was on anode materials, the battery was first discharged.Setting t
Open the pre-set rate work step file.First set aside for 3 hour to allow the battery to stabilize internally.Since the study is on anode materials, the constant current discharge step is set up first.
How to open the curve comparison function Today it demonstrates how to turn on the curve contrast function.
Today, we will demonstrate how to view channel data.
Open the preset cycle test procedure and let the battery rest for 1 hour to stabilize its internal state.Since the study was on cathode materials, the battery was charged first.Setting the constant cu
March 25, 2024
October 08, 2023
ECS is pleased to return to Europe for our first biannual meeting there in over 10 years! Gothenburg, the second largest city in Sweden, has held the #1 ranking on the Global Destination Sustainabilit
March 29, 2023
From 27 to 29 March 2023, the 90th Annual Meeting of the Electrochemical Society of Japan is in Sendai, known as the "capital of trees".
March 13, 2024
2024 Partial Speakers2024 Partial Attendee List PreviewEXHIBIT AND POSTER SCHEDULE
June 16, 2024
IMLB 2024 | The 22nd International Meeting on Lithium BatteriesThe IMLB 2024 Scientific and Organizing Committees are pleased to invite you to the 22nd International Meeting on Lithium Batteries in Ho
September 26, 2022
The 5th Organic Battery Days at the University of Houston will take place on October 13–14, 2022.