Difference between whole-cabinet starting and single-point starting

Latest updated: Dec 22, 2023
Video recording version: 8.0.0.483, BTS 8.0

Today we will demonstrate the difference between whole cabinet startup and single point startup.


  • First, open the BTS8.0 software.

  • Right-click the channel to see the "All start "and "Single start(s)".

  • "Single start( s)" is to start a single channel.

  • "All start " is to start all the channels on the machine.

  • In the list, you can set the value according to your requirement.

  • Finally, click "All start " to realize the whole cabinet start function.

That is all about this topic.Thanks for watching!

This operation video tutorial is applicable to the following products:
● CT-4000 Battery Testing System Series (CT-4008Q-5V100mA, CT-4008Q-5V6A-S1, CT-4008Q-5V6A-164, CT-4008Q-5V12A-S1, CT-4008Q-5V12A-164, etc.)
● CE-6000 Battery Testing System Series (Cell, Module, Pack, etc.)
● CT/CTE-8000 Battery Testing System Series (CT-8002Q-5V100mA, CTE-8008-5V200A, etc.)
● All-in-One Battery Testing System Series (WHW-25-S-16CH, WIHW-200-160CH-B, WHW-100-2-160CH, WHW-500-5V6A80CH-380V, WGDW-380-2-40BFC-5V600A8CH, etc.)



· Related Article

· Battery Exhibitions

· Popular Product

· Solution Scenarios

NEWARE and Cookies
We use Cookie to personalize and improve your experience with our website. By continuing to browse the site you are agreeing to our use of cookies.