How to continue steps

Latest updated: Dec 11, 2023
Video recording version: 8.0.0.483, compatible with BTS 8.0 software.

Today, we will demonstrate how to resume the testing process after a power outage and how to recover unsaved data before the power interruption.

If there is a power outage during battery testing on the workstation, follow these steps to resume the process,


  • Log in to your user account.

  • Right-click on the desired channel that needs to be continued.

  • Click on "Continue" to proceed with the testing process. To retrieve data that was not saved before the power interruption,

  • Click on the "History" page located at the bottom left corner.

  • Use the search function with the Device ID or CH ID to locate the desired data.

  • Right-click on the data and select the option to export the data.


That wraps up the entire demonstration. Thanks for watching.

This operation video tutorial is applicable to the following products:
● CT-4000 Battery Testing System Series (CT-4008Q-5V100mA, CT-4008Q-5V6A-S1, CT-4008Q-5V6A-164, CT-4008Q-5V12A-S1, CT-4008Q-5V12A-164, etc.)
● CE-6000 Battery Testing System Series (Cell, Module, Pack, etc.)
● CT/CTE-8000 Battery Testing System Series (CT-8002Q-5V100mA, CTE-8008-5V200A, etc.)
● All-in-One Battery Testing System Series (WHW-25-S-16CH, WIHW-200-160CH-B, WHW-100-2-160CH, WHW-500-5V6A80CH-380V, WGDW-380-2-40BFC-5V600A8CH, etc.)



· Related Article

· Battery Exhibitions

· Popular Product

· Solution Scenarios

NEWARE and Cookies
We use Cookie to personalize and improve your experience with our website. By continuing to browse the site you are agreeing to our use of cookies.