Global Distributor Recruitment | Create the Future of Battery Testing Together
Click here to easily get the hang of using BTS!
Today, we demonstrate several mapping methods of the main channel.
First, open the BTS8.0 software.
Right-click on the channel and select "Reset mapping".
Enter the reset mapping interface.
The first is the default mapping, right-click on the standalone and select "Clear all".
Right-click again, select the main channel default mapping, select the desired arrangement.
The second one is customized mapping, the operation is the same as above.
Right-click on the stand-alone machine and select "Clear all", right-click again and select "Default mapping" of "Main channels".
Right-click again, select the "Main CH default mapping",and then select "Customize".
The third type is drag-and-drop mapping.
Select the main channel on the left.
Click the left mouse button to drag and drop directly to our 1-1 position.
That is all about this topic.Thanks for watching!
This operation video tutorial is applicable to the following products: ● CT-4000 Battery Testing System Series (CT-4008Q-5V100mA, CT-4008Q-5V6A-S1, CT-4008Q-5V6A-164, CT-4008Q-5V12A-S1, CT-4008Q-5V12A-164, etc.)● CE-6000 Battery Testing System Series (Cell, Module, Pack, etc.)● CT/CTE-8000 Battery Testing System Series (CT-8002Q-5V100mA, CTE-8008-5V200A, etc.)● All-in-One Battery Testing System Series (WHW-25-S-16CH, WIHW-200-160CH-B, WHW-100-2-160CH, WHW-500-5V6A80CH-380V, WGDW-380-2-40BFC-5V600A8CH, etc.)
Previous
Next
How to add and delete servers In the following, we will explain how to add or remove servers.
Set the grading criteria to specific parameter values Here is an demonstration on how to set specific parameter values for grading criteria.
Smooth server upgrades can be performed during battery charging and discharging processes. Conversion of data from previous databases with different structures, applicable to new releases. Before operation, it is recommended to unplug the device from the network cable to test offline, and then operate the upgrade tool after 10 minutes. In this way, the field test channel does not need to stop the test.
How to reset channel alignment Today we will demonstrate how to reset the channel arrangement.
How to enable automatic backup testing on the test step editing page Today, we will demonstrate how to enable automatic backup fpr test data.
How to display real-time curves in the channel interface Today, we will demonstrate how to display real-time curves for channels that are currently being tested on the main interface.
June 23, 2024
Welcome to The International Symposium on Polymer Electrolytes (ISPE-18)The International Symposium on Polymer Electrolytes (ISPE-18) Conference is organized by the American Chemical Society (ACS) Mal
June 28, 2023
Batteries UK Birmingham is an international exhibition for the electric vehicle industry, dedicated to improving battery performance, cost and safety for manufacturers, users and the entire supply cha
December 06, 2022
The 48th Solid State Ion Symposium will be held in Sendai, Japan, from December 6 to December 8, 2022.
May 14, 2024
March 06, 2024
EXHIBIT ITEMSBATTERY RECHARGEABLE: Lithium-ion Battery, NickelCadmium Battery, Air Cell, Energy Storage System, Nickel Metal HydrideBattery, Other Rechargeable Batteries/Storage TechnologiesCAPACITOR:
September 26, 2022
The 2022 MRS Fall Meeting will be held November 27 – December 2, 2022, in Boston, Massachusetts, at the Hynes Convention Center and adjacent Sheraton Boston Hotel, and then December 6 – 8 in a virtual format.