Global Distributor Recruitment | Create the Future of Battery Testing Together
Click here to easily get the hang of using BTS!
First open the BTS8.0 software, log in the user, enter the user name: admin, password: neware.
Click the "Tool" column at the top of the page, and select "Control unit list".
In this page, you can see the device number of the Control unit is 1.
This corresponds to Device ID 1 on the channel page.
Click "History" at the bottom of the page.
Input the amount of data to be searched, the default is to display 40 pieces of data.
This number can be changed. Enter 100 and click "Search".
The test data of different Device ID, Unit ID and CH ID will be displayed.
Data can be filtered by setting Device ID, Unit ID and CH ID.
After completing the data filtering, select the data to be deleted.
After selecting the data, right-click "Delete" and enter the user name: admin, password: neware.
You can also hold down the "Shift" key after selecting a piece of data to select multiple pieces of data for batch deletion.
This operation video tutorial is applicable to the following products: ● CT-4000 Battery Testing System Series (CT-4008Q-5V100mA, CT-4008Q-5V6A-S1, CT-4008Q-5V6A-164, CT-4008Q-5V12A-S1, CT-4008Q-5V12A-164, etc.)● CE-6000 Battery Testing System Series (Cell, Module, Pack, etc.)● CT/CTE-8000 Battery Testing System Series (CT-8002Q-5V100mA, CTE-8008-5V200A, etc.)● All-in-One Battery Testing System Series (WHW-25-S-16CH, WIHW-200-160CH-B, WHW-100-2-160CH, WHW-500-5V6A80CH-380V, WGDW-380-2-40BFC-5V600A8CH, etc.)
Previous
Next
How to save the set grading criteria Here is an explanation on how to save the set grading criteria.
How to delete a row step. Today we will demonstrate how to delete a work step.
Modifying the file naming format for data saving Today we will demonstrate the modification of the file naming format of data save.
Smooth server upgrades can be performed during battery charging and discharging processes. Conversion of data from previous databases with different structures, applicable to new releases. Before operation, it is recommended to unplug the device from the network cable to test offline, and then operate the upgrade tool after 10 minutes. In this way, the field test channel does not need to stop the test.
Open the preset cycle test procedure and let the battery rest for 1 hour to stabilize its internal state.The study is on the anode material of potassium ion batteries, so the batteries are first teste
How to add and delete servers In the following, we will explain how to add or remove servers.
March 01, 2019
NEWARE was attended the BATTERY JAPAN 2019-Int’l Rechargeable Battery Expo from Feb. 27 at Tokyo Big Sight, Japan.
October 08, 2023
ECS is pleased to return to Europe for our first biannual meeting there in over 10 years! Gothenburg, the second largest city in Sweden, has held the #1 ranking on the Global Destination Sustainabilit
September 12, 2022
The 17th Asian Conference on Solid State Ionics (ACSSI) opens on 12th - 15th September, 2022 in Nagoya, Japan.
March 29, 2023
From 27 to 29 March 2023, the 90th Annual Meeting of the Electrochemical Society of Japan is in Sendai, known as the "capital of trees".
May 07, 2024
May 26, 2024
Event Profile245th ECS Meeting: San Francisco, CADate(s): May 26 —30, 2024Venue: Marriott Marquis San Francisco 780 Mission Street San Francisco, CA 94103-3113 Website: https://www.electrochem.org/2